| Year | Project |
Description |
|
1973 |
Milford Haven Steel Box Girder Bridge |
Surface mounted strain and temperature instrumentation. |
|
1974 |
Channel Tunnel, UK (pilot scheme) |
Concrete segment tunnel lining instrumentation. |
|
1976 |
Dubai Dry Dock |
Concrete caisson instrumentation. |
|
1976 |
Dinorwig Pumped Storage Scheme |
Mass concrete strain and temperature monitoring. |
|
1977 |
Drakensberg Pumped Storage Scheme |
Pressure tunnel instrumentation. |
|
1982 |
Victoria Dam, Sri Lanka |
Mass concrete strain and temperature monitoring. |
|
1986 |
Channel Tunnel, UK |
Structural survey of existing linings. |
|
1988 |
Canary Wharf, UK |
Instrumented test piles. |
|
1989 |
Channel Tunnel, UK |
Instrumented concrete and iron tunnel lining segments. |
|
1989 |
Channel Tunnel, UK |
Instrumented test piles |
|
1989 |
A10/A406 junction improvement, UK |
Temporary prop load measurement. |
|
1990 |
Storeb'lt, Great Belt Project, Denmark. |
Intelligent concrete lining segments, Eastern Tunnel. |
|
1992 |
Lesotho Highlands Water Project |
Instrumented concrete and iron tunnel lining segments, Delivery Tunnel North |
|
1994 |
New Inland Revenue Building, UK |
Monitoring system for support bars, membrane roof. |
|
1994 |
A12- M11 Link Road, UK |
Temporary prop load monitoring system. |
|
1995 |
Rotherhithe London Underground Station, UK |
Structural monitoring system for temporary and permanent props. |
|
1995 |
Heathrow Express Rail Link, UK |
Shotcrete tunnel lining monitoring system. |
|
1995 |
Jubilee Line Extension, UK |
General instrumentation for tunnels and bridges. |
|
1997 |
Malaysia Singapore Second Crossing |
Bridge segment monitoring system. |
|
1997 |
Deeside Road Link, River Crossing, UK |
Link research programme for smart bridges. |
|
1998- |
Hong Kong |
Concrete and steel driven piles |
|
1998- |
Korea |
Various projects including shotcrete tunnel linings. |
| 2001 | Copenhagen Metro | Real-time monitoring of the effects of tunnelling on adjacent structures. Use for construction control. |